4.09 Positive Response to Locate Request.3.32: Communicate Potential for Privately-Owned Facilities.3.30 Locate Information Shared with Excavator.3.29 One Call Facility Locate Request Size and Scope.3.22 Hardware Designed to Tolerate a Single Point of Failure.3.20 Accept Multiple Reference Points for Locate Requests.3.17 Practices to Reduce Overnotifications.3.15 One Call Center Accepts Notifications from Designers.3.14 Meeting between the Excavator and Facility Operator(s) Initiated by One Call Notification.3.12 Documented Owner Verification of Data Submitted by Facility Owners/Operators.3.11 Documented Operating Procedures, Human Resource Policies, and Training Manuals.3.08 Retention of Voice Records According to Applicable Statutes.3.07 Voice Record of All Incoming Calls.3.05 Single Toll-free Statewide Telephone Number with Nationwide Access.3.02 Specifically Defined Geopolitical Service Area with No Overlap.3.01 Proactive Public Awareness, Education, and Damage Prevention Activities.2.19 Underground Electronic Utility Markers.2.18 Identifying newly installed or under construction facilities.2.14 Subsurface Utility Engineering (SUE).2.10 Continuous Interface between the Designer and the Contractor During the Construction Phase.2.09 Continuous Interface between the Designer and Potential Contractors During the Prebid/Bid Phase.2.06 Follow All Applicable Codes, Statutes, and Facility Owner/Operator Standards.2.05 Markers for Underground Facilities.2.03 Identifying Existing Facilities in Planning and Design.2.02 Gathering Information for Design Purposes.2.01 Plat Designation of Existing Underground Facility Easements.1.02 History of the Common Ground Alliance. ![]() 1.01 Best Practices Manual - Version 17.0.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |